Dry Cleaners Field Module

Not saved. Select Save Draft before leaving this page.

Dry Cleaners Field Inspection Worksheet

Field worksheet for documenting dry cleaning and laundry operations, boilers, equipment, fire protection, building systems, premises conditions, and report-ready notes.

Risk / Building / Contact

Building / System Updates

Operations / Services

Laundry / Dry Cleaning Equipment

Boiler / Heat / Venting

Field reminder: Document and photograph any clothing or combustible storage above or near boilers; recommend removal when warranted.

Values / Protection / Life Safety

Exterior / Premises / Losses

Photos to Obtain

Narrative Insert

The risk ___ this ___ story ___ building located in a ___ area, approximately ___ miles from the ___. The building and housekeeping are maintained in ___ condition. Building updates reported/observed include roof ___, electrical ___, plumbing ___, HVAC ___, and other updates ___.

The risk operates a ___ dry cleaners with business hours from ___ to ___. This is ___ a drop-off station, as there are ___ dry cleaning machines on site. This ___ a public laundromat consisting of ___ washers and ___ dryers.

The risk does ___ offer alterations and has ___ stitching machines. The risk offers ___ pick-up/delivery. There is a public area of approx. ___ sq ft. There are ___ steel racks and ___ conveyor for laundered clothing. The rear area serves as ___ and contains ___.

There is ___ boiler with ___ vent/duct system and ___ pressure relief valve. The boiler is inspected ___, with the last inspection date of ___. Contact name ___ estimated the contents value at $___, consisting of ___. Contact estimated projected gross annual sales at $___.

The store has ___ burglar alarm, ___ fire alarm, and ___ fire sprinkler system. There are adequate exits, lighted exit signs, and emergency lights. The exterior lighting, sidewalks, parking lot, and rear/service areas are maintained in ___ condition. The total area is ___ sq ft.

Recommendations: