Dry Cleaners Field Module
Dry Cleaners Field Inspection Worksheet
Field worksheet for documenting dry cleaning and laundry operations, boilers, equipment, fire protection, building systems, premises conditions, and report-ready notes.
Risk / Building / Contact
Building / System Updates
Operations / Services
Laundry / Dry Cleaning Equipment
Boiler / Heat / Venting
Field reminder: Document and photograph any clothing or combustible storage above or near boilers; recommend removal when warranted.
Values / Protection / Life Safety
Exterior / Premises / Losses
Photos to Obtain
Narrative Insert
The risk ___ this ___ story ___ building located in a ___ area, approximately ___ miles from the ___. The building and housekeeping are maintained in ___ condition. Building updates reported/observed include roof ___, electrical ___, plumbing ___, HVAC ___, and other updates ___.
The risk operates a ___ dry cleaners with business hours from ___ to ___. This is ___ a drop-off station, as there are ___ dry cleaning machines on site. This ___ a public laundromat consisting of ___ washers and ___ dryers.
The risk does ___ offer alterations and has ___ stitching machines. The risk offers ___ pick-up/delivery. There is a public area of approx. ___ sq ft. There are ___ steel racks and ___ conveyor for laundered clothing. The rear area serves as ___ and contains ___.
There is ___ boiler with ___ vent/duct system and ___ pressure relief valve. The boiler is inspected ___, with the last inspection date of ___. Contact name ___ estimated the contents value at $___, consisting of ___. Contact estimated projected gross annual sales at $___.
The store has ___ burglar alarm, ___ fire alarm, and ___ fire sprinkler system. There are adequate exits, lighted exit signs, and emergency lights. The exterior lighting, sidewalks, parking lot, and rear/service areas are maintained in ___ condition. The total area is ___ sq ft.